Infrastructur filling stations H2 hydrogen CEP Clean Energy Partnership Fuel Cell Technology
Infrastructur filling stations H2 hydrogen CEP Clean Energy Partnership Fuel Cell Technology

H2 INFRASTRUCTURE

A NETWORK OF FILLING STATIONS FOR GERMANY

Fuel cell vehicles use gaseous hydrogen as a fuel. In the fuel cell , this is converted into electricity which in turn drives an electric motor. The refuelling process is similar to refuelling with natural gas and takes about three minutes. The CEP is advancing the expansion of Germany’s network of filling stations and sets uniform standards for refuelling.

Availability of H2-stations

To the interactive map at NOW GmbH

Filling station Nordallee (Total), Flughafen Köln/Bonn

filling station

public

Kraftstoffe

konventional fuels, gaseous hydrogen with 700 bar

Besonderheit

Equipment for an optional 350-bar fuel pump for bus refuelling is pre-installed

Filling station Osterholzer Heerstr. (Shell), Bremen

filling station

public

Kraftstoffe

konventional fuels, gaseous hydrogen with 700 bar

special features

Located directly on the Sebaldsbrück motorway exit and the Bremen interchange, and is also near the Mercedes-Benz plant in Bremen, one of Daimler AG’s largest car plants in the world.

Filling station Autohof Bad Rappenau-Bonfeld (Air Liquide), Bad Rappenau

filling station

public

Kraftstoffe

konventional fuels, hydrogen gas with 700 bar

special features

at the highway

filling station Borsigstr. (Shell), Wiesbaden

filling station

public

fuels

conventional fuels, hydrogen gas with 700 bar

filling station Neckarstr. (Shell), Sindelfingen

filling station

public

fuels

conventional fuels, hydrogen gas with 700 bar

filling station Detmoldstr. (Total), München

filling station

public

fuels

conventional fuels, LPG, hydrogen gas with 700 bar, cryo-compressed hydrogen at 300 bar

special features

refuelling with hydrogen cryo-tank technique (CCH2)

filling station Geiselwind-Autohof Strohofer (Total), Geiselwind

filling station

public

fuels

conventional fuels, gaseous hydrogen at 700 bar

capacity

80 cars per day

special features

first hydrogen filling station right next to highway (A3)

filling station Berlin-Schönefeld BER (Total), Berlin

filling station

public

fuels

conventional fuels, bio natural gas, LPG, charging station, gaseous hydrogen at 350 and 700 bar

capacity

10 buses and 100 cars per day

special features

on-site electrolysis, "green" hydrogen production from wind power

filling station Holzmarktstraße (Linde / Total), Berlin

filling station

public

fuels

conventional fuels, bio natural gas, LPG, charging station, gaseous hydrogen at 350 and 700 bar

capacity

5 buses and 50 cars per day

special features

photovoltaic system, block heat and power plant, delivery of liquid hydrogen, information room

filling station Heidestraße (Linde / Total), Berlin

filling station

public

fuels

conventional fuels, natural gas, LPG, gaseous hydrogen at 700 bar

capacity

150 kg / day, approx. 50 cars per day

special features

Delivery of hydrogen from the BtH (biomass to hydrogen) facility in Leuna and from wind electrolysis (wind of hydrogen) in Prenzlau

filling station Sachsendamm (Shell), Berlin

filling station

public

fuels

gaseous hydrogen at 350 and 700 bar

capacity

250 cars per day

filling station HafenCity (Vattenfall / Shell), Hamburg

filling station

public

fuels

gaseous hydrogen at 350 and 700 bar

capacity

20 buses or 200 cars per day

special features

located in the HafenCity, on-site electrolysis

filling station Aluminiumstr. (Total), Hamburg

filling station

public

fuels

conventional fuels, gaseous hydrogen with 700 bar

capacity

30 - 35 cars per day

special features

delivery of hydrogen

filling station Hamburg-Schnackenburgallee (Shell), Hamburg

filling station

public

fuels

conventional fuels, Natural gas, LPG, gaseous hydrogen at 700 bar

capacity

20 cars per day

special features

on-site electrolysis

filling station Bramfelder Chaussee (Shell), Hamburg

filling station

public

fuels

gaseous hydrogen with 700 bar

capacity

25 cars per day

special features

delivery of gaseous hydrogen

filling station Höherweg (Air Liquide), Düsseldorf

filling station

public

fuels

gaseous hydrogen at 350 and 700 bar

capacity

50 cars per day

special features

delivery of gaseous hydrogen, information room

filling station Fellbach (Total), Region Stuttgart

filling station

public

fuels

conventional fuels, bio natural gas, LPG, charging station, gaseous hydrogen at 700 bar

capacity

50 cars per day

filling station Flughafenstr. (OMV), Stuttgart

filling station

public

fuels

conventional fuels, LPG, hydrogen gas with 350 bar and 700 bar

capacity

ca. 64 cars and 4 buses per day

filling station Kopenhagener Straße (Westfalen), Münster

filling station

public

fuels

gaseous hydrogen with 350 and 700 bar, conventional fuels, LPG, charging station

capacity

5 busses or 50 cars per day

special features

two fuel pumps: one with 700-bar technology for cars, the other with 350-bar technology for cars and buses

mobile hydrogen filling station (Linde)

trailer dimensions

14 m x 2,6 m x 4 m

weight

35t

fuels

gaseous hydrogen with 350 and 700 bar

capacity

160 kg

Nach oben

|